The master bedroom/bath project is pretty well done. We took two bedrooms and made one nice large master bedroom. We moved up to a king-sized bed, which is wonderful. A new bed and side dressers are on order (Maine Cottage went out of business, but is now being taken over by Russell MaKenna). Yes, I'm getting a red bed. . . . again.
Jan designed it all and Forrest the Contractor made it happen. The two new little closets with the red doors are just right. We took out a large closet on the other side and opened that space up for the red cabinet (which I got at The Cottage in Leesburg last year). It feels so good with all the open space. The Container Store set me up with Elfa closet dividers, and they will be great once I get them all organized.
The little vanity dressing table between the two little red closets came from The Cottage. The art is all my collected folk art which includes many Nancy Thomas pieces. Jan hung it all, and it brought life to the space.
We also put hardwood floors on the entire second level--such a great look. I'm so sick of carpet--always seems to need cleaning. After my last $700 carpet cleaning bill, I knew that I would move on to hardwood floors.
We still need the new furniture and window treatments, but it's getting there.